January 13th, 2010, 10:38 PM
We are delayed on the full Car kits, due to Lack of good carbon fiber materials. We currently have a new supplier that is going to provide materials. We have an extremely high QC standard on the flexibility of the plates. If it doesn't meet those standards it is not machined.
We have an estimated date of feb 1st for the production carbon fiber parts.
Improvements over the USOW cars
Adjustable Wheel Base
Adjustable Rear Shock Tower Position
Adjustable Transmission Position
Lighter, Additional Areas have been machined out. not sure why already adding 2oz to be legal. LOL
Battery can be place in the Center 2/3 and left side of the car. Basically anywhere in the car.
Torisional Flex is equalized left to right.
Additional Shock mounting Locations ( Alllowing the use of 4 different size shock bodies or shaft sizes
Lowered the overall COG
Front Bumper, Rear Body Mount, All Move in the same dimensional increments allowing you to move the body orTrans,and or wheelbase to either increase or decrease the down forces due to the placement of either weight or body positioning. Just a little extra Fine tuning.
Everything should be on schedule to be complete and in stock Feb 1st!
We have an estimated date of feb 1st for the production carbon fiber parts.
Improvements over the USOW cars
Adjustable Wheel Base
Adjustable Rear Shock Tower Position
Adjustable Transmission Position
Lighter, Additional Areas have been machined out. not sure why already adding 2oz to be legal. LOL
Battery can be place in the Center 2/3 and left side of the car. Basically anywhere in the car.
Torisional Flex is equalized left to right.
Additional Shock mounting Locations ( Alllowing the use of 4 different size shock bodies or shaft sizes
Lowered the overall COG
Front Bumper, Rear Body Mount, All Move in the same dimensional increments allowing you to move the body orTrans,and or wheelbase to either increase or decrease the down forces due to the placement of either weight or body positioning. Just a little extra Fine tuning.
Everything should be on schedule to be complete and in stock Feb 1st!